SECTORS

Sectors

Flood Defences

CLIENT: East Riding of Yorkshire Council


PROJECT: Hessle Haven Sluice Structure


PROJECT DETAILS: The construction works form part of the Hessle Foreshore Tidal Defence Scheme (HFTD), which aims to provide an increased level of protection from tidal surge events to over 4000

properties in Hessle and the surrounding area.


Hessle Haven Sluice Structure scheme consists of raising the height of the existing sluice structure wall by means of an in-situ reinforced concrete extension. Remedial works to the existing brickwork structure and culvert. In addition, the design, fabrication and installation of steel access staircase and pumping pipework for the Environment Agency.

PROJECT DURATION: 11 weeks (appox)


PROJECT VALUE: £300,000 (approx)


FORM OF CONTRACT: NEC 3 Option A


SERVICES SUPPLIED:  Commercial Management and NEC Consultancy Advice & Support

CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants


PROJECT:   South Withernsea Coastal Defences


PROJECT DETAILS: The undefended coastline to the south of the Withernsea frontage is currently eroding at a rate of between 3 to 5 metres per year. Within the next few years this coastal erosion will

impact upon residential properties and major infrastructure such as Holmpton Road. These works will provide permanent protection against further coastal erosion, thereby securing the future development and prosperity of this otherwise threatened frontage.


The scheme comprises the construction of a new rock armour coastal defence that will extend the existing Withernsea defences southwards by a further 400m. This defence will control coastal erosion that is currently occurring at a rate of between 3 to 5 metres per year.

PROJECT DURATION: 30 weeks


PROJECT VALUE: £6.4m


FORM OF CONTRACT: NEC 3 Option A


SERVICES SUPPLIED:  Commercial Management and NEC Consultancy Advice & Support

CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants

PROJECT: Pocklington Flood Alleviation Scheme

PROJECT DETAILS: The Pocklington Flood Alleviation Scheme (POCFAS) is comprised of:
  1. The construction of a flood attenuation bund (5m high, 600m in length and 45m wide with a 5.0m wide access/maintenance strip running the full length) across Pocklington Beck upstream of the village of Pocklington.
  2. A culvert through the attenuation bund with a flow control device which maintains/restricts the the flow of Pocklington Beck.
  3. Associated access tracks, fencing and landscaping works.
The scheme is being constructed to reduce the excess flows from extreme rainfall events from flowing along Pocklington Beck into the built-up areas downstream of the proposed works. The excess flows are to be managed via a flow control device and attenuated behind the constructed attenuation bund.
PROJECT DURATION: Sep 2018 - Dec 2019

PROJECT VALUE: £2.5m

FORM OF CONTRACT: NEC 3 Option C

SERVICES SUPPLIED: Commercial Management & NEC Consultancy Services
CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants

PROJECT: Anlaby & East Ella Flood Alleviation, Phases 2 & 3

PROJECT DETAILS: The Anlaby and East Ella Flood Alleviation Scheme (AEEFAS) Phase 2 project is comprised of the following works:
  • Alterations to spillway and control structures to an existing flood alleviation lagoon.
  • Creation of a flood alleviation lagoon of circa 130,000m3 capacity, generally raised above existing ground levels.
  • Lagoon outfall drainage with connection to existing surface water sewer through a flow control structure and device.
  • Construction of flood water channel between the above lagoons, some 800m length.
  • Agricultural access bridge across new flood water channel.
  • Associated fencing, access and maintenance tracks and landscaping.
  • Contractor design of Hydrobreak flow control device, trash screens, collapsible fencing, pitch drainage pump installation, sports pitch drainage and pedestrian handrails and parapet restraint systems along with its fixings and bases.
  • Drainage and preparation works for a circa 90,000 m2 sports pitch complex.
The Anlaby and East Ella Flood Alleviation Scheme Phase 3 is comprised of the following works: 
  • Flood water collection structures in two locations that deliver flood waters into a 1.8m diameter tunnel/culvert to carry them through the high points of the catchment area before discharging them into an open watercourse that carries the flood water into the PH2 works described above. 
  • A flood water transfer unit in and a series of open watercourses collect overland flood flows. 
  • A flood water collection arrangement collects further waters and directs these into the culvert. The accumulated waters in the culvert discharge into an energy dissipation structure at the start of the watercourse and the outfall watercourse includes additional energy dissipation measures. 
  • A series of permanent access tracks, landscaping works and commissioning and testing of the complete installation.
Refer to recent article on the AEEFAS project published in Tunnels & Tunnelling magazine.
PROJECT DURATION: Feb 2018 - Feb 2020

PROJECT VALUE: £12m

FORM OF CONTRACT: NEC 3 Option C

SERVICES SUPPLIED: Commercial Management & NEC Consultancy Services
Get in touch

Infrastructure

CLIENT: East Riding of Yorkshire Council


PROJECT:   A164 and Jock's Lodge


PROJECT DETAILS: The A164 and the A1079 are two of the busiest roads in the East Riding.


Despite work being carried out over the years to improve the safety of the junction, congestion issues have worsened, and the only solution is a major road improvement scheme.


PROJECT DURATION: 140 Weeks


PROJECT VALUE: £86.9m


FORM OF CONTRACT:  NEC 4 EEC Option C


SERVICES SUPPLIED:  Commercial Management and NEC Consultancy Advice & Support


CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants


PROJECT:   Beverley J Roundabout


PROJECT DETAILS: The construction of a new roundabout on Minster Way, Beverley, east of the Shepherds Lane junction, west of the rail bridge.

PROJECT DURATION: 26 weeks


PROJECT VALUE: £1m


FORM OF CONTRACT: NEC 3 Option A


SERVICES SUPPLIED:  Commercial Management and NEC Consultancy Advice & Support

CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants

PROJECT: Bridlington Integrated Travel Plan: Phase 2, Stage 1

PROJECT DETAILS: The Bridlington Integrated Transport Plan Phase 2 (BridITP2) delivers key elements of the Bridlington Area Action Plan (AAP). Stage 1 will provide a high quality focal point for the town by redeveloping the Rail Station Approach and Plaza area with high quality paving and landscaping. 

The works will provide an improved access to the Rail Station and a link road through to the Tesco access road, thus creating a predominantly one way traffic flow and reducing the traffic movements at the Station Approach/Quay Road junction.
PROJECT DURATION: 52 Weeks

PROJECT VALUE: £1.86m

FORM OF CONTRACT: NEC 3 Option C

SERVICES SUPPLIED: Commercial Management and NEC Consultancy Advice & Support
CLIENT: Crosby Ferguson & Medcalf Civil Engineering & Street Lighting Consultants

PROJECT: Brough Relief Road PH2

PROJECT DETAILS: The Brough Relief Road PH2 consists of the construction of a new road carriageway connecting into an existing live carriageway roundabout. The new road crosses the Hull to Selby Rail Line via the construction of a rail bridge and ends at a newly constructed roundabout with four stub arms (provision for connection to be made during future development). 

The project included the construction/provision/installation of new carriageway, integral bridge, footway/cycleway, verge, water services, lighting, drainage and landscaping. The majority of roadway was constructed on raised embankments requiring the works to be constructed on imported fill.

PROJECT DURATION: Jan 2017 - Feb 2018

PROJECT VALUE: £4m

FORM OF CONTRACT: NEC 3 Option A

SERVICES SUPPLIED: NEC Project Manager
Get in touch

Mixed Use

CLIENT: Wates

PROJECT: Central Square, Wellington Street, Leeds

PROJECT DETAILS: Central Square is a landmark new office led mixed use complex located in Leeds City Centre. The scheme provides high quality, highly sustainable office accommodation at the upper levels above restaurants and shops at ground floor. The building provides the largest office floor plates available in the city of 25,000 ft² net, arranged so they are capable of sub-division, providing flexible and highly efficient floor space.

Central Square wraps around an inviting winter garden and atrium space, in a form which follows the existing contiguous piles that were located as part of the previous Lumiere scheme and subsequently exposed to create underground car parking. This forms part of a stunning new public realm with greatly enhanced pedestrian connectivity across this urban infill block resulting in almost 80% of the overall site area being publicly accessible.

PROJECT VALUE: £45m

FORM OF CONTRACT: JCT with Design

SERVICES SUPPLIED: Commercial review of sub-contract works package on the settlement of 2 Stage Tender.
CLIENT: Houlton

PROJECT: Fruit Market, Humber Street, Hull

PROJECT DETAILS: The Humber Street refurbishment project, a major and complex scheme refurbishing a set of long term empty properties on Humber Street and Pier Street in Hull. The commercial refurbishments transformed the former warehouses into units of flexible space that promote and accommodate new creative industries such as galleries, offices, digital companies as well as providing grow on spaces, and independent retail/restaurant/café uses. Additionally a number of units were transformed into affordable accommodation.

CONTRACT DURATION: 90 weeks

PROJECT VALUE: £4m

FORM OF CONTRACT: NEC 3 Option D

SERVICES SUPPLIED: Commissioned to commercially manage the project on behalf of the Main Contractor.
Get in touch

Education

CLIENT: East Riding of Yorkshire Council

PROJECT: Goole Academy Goole

PROJECT DETAILS: A new two storey teaching facility comprising of a wide range of teaching, social and administration functions. The steel framed structure has a mixture of external masonry combining a red multi-facing brick to compliment the adjacent existing grade 2 listed buildings and a light polished masonry block to the south facing courtyard elevations. In addition vertical larch cladding has been used to articulate the north and east elevations. The roof structure is a combination of Kalzip built up and green roofing systems.

CONTRACT DURATION: 63 weeks

PROJECT VALUE: £7m

FORM OF CONTRACT: NEC 3 Option B

SERVICES SUPPLIED: NEC 3 Project Manager
Get in touch

Entertainment

CLIENT: East Riding of Yorkshire Council

PROJECT: Bridlington Spa

PROJECT DETAILS: Full refurbishment of the existing Spa complex including new roofing, extension and new build office accommodation and meeting spaces, relocation and remodelling of the existing entrance area and full refurbishment of existing areas to provide flexible accommodation suitable for a wide variety of uses including concerts, rally’s fairs, sporting events, conferences and meeting facilities.

PROJECT VALUE: £20m

FORM OF CONTRACT: NEC 3 Option C

SERVICES SUPPLIED: Commercial Management of Compensation Events
Get in touch

Residential

CLIENT: Wates

PROJECT: Vita York Student Accommodation

PROJECT DETAILS: Approximately 600 student accommodation units spread across several new build blocks and external works and the refurbishment and conversion of a grade 2 listed building in to additional accommodation and supporting facilities.

PROJECT VALUE: £40m

FORM OF CONTRACT: JCT with Design

SERVICES SUPPLIED: Sub-Contract & Supply Chain Procurement
CLIENT: PDR Construction

PROJECT: Q4 131 Apartments, Sheffield

PROJECT DETAILS: 131 Apartments, Timber Frame Structure, Brick & Cedar Board Cladding, Bathroom Pods

PROJECT DURATION: 60 Weeks

PROJECT VALUE: £9m

FORM OF CONTRACT: JCT 2005 with Contractors Design

SERVICES SUPPLIED: Quantity Surveying & Commercial Management
CLIENT: PDR Construction

PROJECT: Residential Development - Brandesburton

PROJECT DETAILS: 10 nr 2 & 3 Bed Dwellings

CONTRACT DURATION: 30 Weeks

PROJECT VALUE: £1m

FORM OF CONTRACT: JCT 1998 with Contractors Design

SERVICES SUPPLIED: Quantity Surveying & Commercial Management
Get in touch

Affordable Housing/Extra Care

CLIENT: East Riding of Yorkshire Council


PROJECT:  Milne House


PROJECT DETAILS: The project involved the construction of a two-storey building containing six one-bedroom flats, including three on both the ground and first floors, on an area of land in Thornton Road, off Bessingby Gate in Bridlington. 


The scheme will also benefit from new off-street parking and cycle storage with pedestrian access off Thornton Road. 


Previously, the land contained redundant stores and a concrete hardstanding which were formerly associated with the three blocks of existing East Riding of Yorkshire Council-owned flats along Thornton Road. 

The project has suffered a slight delay due to increased COVID restrictions and the need for social distancing on site. 


Helen McEgan, Principal Asset Officer at East Riding of Yorkshire Council, added: “I am delighted to see that construction of this scheme is nearing completion and look forward to welcoming new residents in the not too distant future. The scheme will deliver high-quality housing in a popular location, and the reuse of brownfield land helps to ensure that the council is managing its assets in the most cost effective and sustainable way. The development was part funded by a £0.234m grant from Homes England, the Government’s housing accelerator.”


CONTRACT DURATION:  52 Weeks


PROJECT VALUE: £718k


FORM OF CONTRACT:  NEC3 Option C


SERVICES SUPPLIED:  Project Management


CLIENT: East Riding of Yorkshire Council

PROJECT: 2 & 3 Bedroom Houses & Bungalows in East Yorkshire

PROJECT DETAILS: The delivery of affordable housing projects throughout the East Riding of Yorkshire, ranging from small scheme of 4 to 6 properties upto completion of a new estate in Bridlington consisting of circa 115 properties.  

The schemes consisted of two and three bedroom properties designed and constructed to level 4 of the code for sustainable homes, including rainwater harvesting, photo voltaic roof tiles and high levels of insulation and air tightness results and the secure by design standard all essential funding requirements. Infrastructure works also included new access roads, footpaths, street lighting, drainage and services.

FORM OF CONTRACT: NEC 3 – Options A & C

COMMERCIAL SERVICES PROVIDED: 
  • Cost Planning & BQ Production.
  • Tender documentation, review and negotiation with contractors.
  • Commercial management of the projects through construction phases.
  • Preparation and agreement of final accounts with contractors.
PROJECT MANAGEMENT SERVICES: 
  • Named NEC Project Manager
Get in touch

Commercial

CLIENT: PDR Construction

PROJECT: Paragon Business Park - Wakefield

PROJECT DETAILS: 25,000 sq.ft two storey offices

CONTRACT DURATION: 28 weeks

PROJECT VALUE: £1.4m

FORM OF CONTRACT: JCT 98 with Contractors Design

SERVICES SUPPLIED: Quantity Surveying & Commercial Management.
Get in touch

Industrial

CLIENT: Wates

PROJECT: Haribo Production Facility, Castleford

PROJECT DETAILS: A state of the art production facility For Haribo, including four production buildings, an energy conservation centre, silo buildings a gatehouse and extensive external works.

PROJECT VALUE: £45m

FORM OF CONTRACT: JCT with Design

SERVICES SUPPLIED: Sub-Contract Procurement and Subcontract/Supply Chain Commercial Management
CLIENT: PDR Construction

PROJECT:  Stourton Link - Leeds

PROJECT DETAILS: 40,000 Sq.ft Industrial Units & Offices

CONTRACT DURATION: 33 Weeks

PROJECT VALUE: £2m

FORM OF CONTRACT: JCT 98 with Contractors Design

SERVICES SUPPLIED: Quantity Surveying & Commercial Management
CLIENT: PDR Construction

PROJECT: The Car People, Sheffield

PROJECT DETAILS: The Car People, Showroom, Workshop, Offices and Extensive Carparking and External Works

CONTRACT DURATION: 34 Weeks

PROJECT VALUE: £3.5m

FORM OF CONTRACT: JCT 2005 with Contractors Design

SERVICES SUPPLIED: Quantity Surveying & Commercial Management
Get in touch

Crematoria

CLIENT: East Riding Yorkshire Council


PROJECT:  Lelley Field Bereavement Project


PROJECT DETAILS: Crematorium including two service halls, a new woodland, a memory walk and other areas for remembrance and celebration.


PROJECT VALUE:  £9.6m


FORM OF CONTRACT:  NEC 3 Option A


SERVICES SUPPLIED:  Two Stage Tender & Price Development with Selected Contractor

Get in touch

Contact Us


Whether you are looking for commercial or contractual advice, or a quantity surveying or project management service, we’re here to help. Contact us now to discuss your requirements further.

Contact us

Share by: